What certifications are required to import a drink machine into the EU and the US?
Certification is where importers lose the most time, because a machine can be perfectly built and still be refused at the border for a missing declaration.
This page lists what each market actually asks for, which documents the manufacturer must supply, and the four mistakes that cause most delays.
Short answer. For the EU you need CE marking supported by LVD, EMC and Machinery Directive test reports, RoHS, food-contact compliance for every wetted part, and WEEE registration in the country of sale.
For the US you need an FCC declaration for unintentional radiators, listing by a Nationally Recognized Testing Laboratory (UL or ETL), and FDA-compliant food-contact materials.
European Union
CE marking is a self-declaration, but it must be backed by a technical file and test reports from an accredited laboratory. Customs and market surveillance can ask for the file at any time.
Food contact is the requirement that is most often missed. Every part that touches a drink — tubing, mixing chamber, nozzle, cup chute — must comply with Regulation (EC) 1935/2004 and with the specific measure for plastics (EU) 10/2011.
Germany's LFGB is stricter still and is commonly requested by buyers even though it is not an EU-wide obligation.
- Low Voltage Directive 2014/35/EU — safety of the electrical parts
- EMC Directive 2014/30/EU — emissions and immunity
- Machinery Directive 2006/42/EC — moving parts, guarding, emergency stop
- RoHS 2011/65/EU — restricted substances in electronics
- Food contact: (EC) 1935/2004 and (EU) 10/2011; LFGB on request
- WEEE 2012/19/EU — registration in each country of sale
- Packaging Directive 94/62/EC — packaging materials and labelling
United States
There is no federal 'vending machine certificate'. Compliance is split across three regimes, and each produces its own document.
FCC Part 15 covers the electronics: a machine with a Wi-Fi or 4G module is an intentional radiator and needs the appropriate authorisation; a machine without radio needs a Supplier's Declaration of Conformity.
Electrical safety is enforced by the Authority Having Jurisdiction, which in practice means an NRTL listing — UL or ETL. An unlisted machine will fail inspection in most commercial premises and may void the site's insurance.
Food contact falls under the FDA's 21 CFR 174–178 for indirect additives. Separately, California Proposition 65 requires a warning for listed substances unless exposure is below the safe-harbour level; this catches many imported machines on cable insulation and solder.
Other markets worth planning for
If you sell into several countries from one warehouse, build the file once and add the local marks rather than re-certifying per shipment.
- United Kingdom — UKCA, accepted in place of CE on the GB market
- Australia and New Zealand — RCM mark, EESS registration for the power supply
- Canada — cUL or cETL, plus ISED radio certification
- Saudi Arabia and UAE — SASO / ESMA plus country-of-origin documentation
- Japan — PSE mark for the electrical parts, Technical Conformity for radio
The four mistakes that delay shipments
First: a CE certificate is presented instead of a CE Declaration of Conformity plus test reports. A certificate without reports does not survive scrutiny.
Second: food-contact reports cover the machine but not the consumables. Capsules, cups and lids are also food-contact articles and need their own documentation.
Third: the model on the test report does not match the model on the commercial invoice. Even a suffix difference triggers a query.
Fourth: WEEE and packaging registration is left until the goods arrive. Both are country-level obligations that take days to weeks to complete.
What to ask the manufacturer for, by market
| Market | Documents to obtain | Issued by | Typical lead time |
|---|---|---|---|
| EU | CE DoC, LVD/EMC/MD reports, RoHS, food-contact reports, WEEE number | Accredited lab + manufacturer | 2–4 weeks |
| US | FCC authorisation, NRTL listing report, FDA food-contact statements, Prop 65 assessment | FCC lab, UL/ETL, supplier | 3–6 weeks |
| UK | UKCA DoC, equivalent test reports | Accredited lab | 2–4 weeks |
| AU/NZ | RCM DoC, EESS registration | Supplier + local agent | 1–3 weeks |
Related
- Site requirements: space, power and plumbing
- 12-point checklist for evaluating a supplier
- Machine specifications and certifications
FAQ
Is a CE certificate the same as a CE declaration?
No. The Declaration of Conformity is a legal document signed by the manufacturer, listing the directives applied and the standards used. Test reports are the evidence behind it. Customs and market surveillance ask for both; a certificate alone is not sufficient.
Does the machine need UL listing to be sold in the US?
There is no federal law requiring it, but the Authority Having Jurisdiction at the installation site generally requires an NRTL-listed machine, and insurers increasingly do the same. Treat UL or ETL listing as a commercial requirement even where it is not a statutory one.
Are capsules and cups covered by the machine's food-contact report?
No. They are separate food-contact articles and need their own declarations and migration testing. Importers are usually the responsible party for the consumables they place on the market.
How long does certification take for a new model?
For a variant of an already-certified platform, two to four weeks for EU documents. A new electrical architecture can take eight to twelve weeks because EMC and safety testing must be repeated.
Does a Wi-Fi module change the certification?
Yes. It turns the machine into an intentional radiator, which requires radio certification (FCC Part 15 Subpart C in the US, RED in the EU) in addition to the safety and EMC files.