Site Readiness Checklist Before Installing an Unmanned Drink Machine

In one line: A site is ready when four things are confirmed in writing: the operating footprint, the power supply, the water approach and the refill access route.

Key facts: operating footprint | power supply confirmation | water approach options | refill access route | written sign-off | 1000+ business clients

Why site readiness comes first

Site readiness is confirmed before a machine is ordered, not after it arrives. Four checks decide whether an installation runs smoothly: the operating footprint, the power supply, the water approach and the refill access route.

Each check has an owner - the site, the contractor, or the operator - and each one should be signed off in writing. A site that clears all four is ready to order.

The four checks

CheckWhat to confirmWho confirms
Operating footprintMachine footprint plus the customer operation space plus the refill pathSite
Power supplyA usable supply point, spare circuit capacity and the cable routeSite and contractor
Water approachWhether the site takes a plumbed supply or a self-contained tankContractor
Refill accessThat a refill trolley can reach the machine faceOperator

Measuring the machine body alone understates the space needed; the operation space and refill path are part of the footprint.

Power and water in practice

Deciding the water approach first avoids a rebuild later - the machine position and the plumbing plan have to agree.

Turning the checklist into a sign-off

RowEvidence to keep
FootprintOn-site photo with measurements
PowerCircuit and route note
WaterChosen approach in writing
AccessMeasured refill route time

Four rows of evidence make a handover concrete and keep later changes traceable. The related article on peak throughput explains why the operation space matters during busy periods.

After the site clears

Once the four rows are signed off, the next step is choosing the machine configuration that fits the footprint and the expected demand. Machine models - over 100 in the range, serving clients in 100+ countries and regions - are covered on the product page, and a reference configuration can be requested through the contact page.

Common questions

What makes a site ready for an unmanned drink machine?

Four written confirmations: operating footprint, power supply, water approach and refill access route.

Do I need plumbing?

Not always. The site either takes a plumbed supply or a self-contained tank, decided by what the site can support.

How much space should be reserved?

The machine footprint plus the customer operation space plus the refill path; reserve all three rather than the body alone.

Who confirms each check?

The site, the contractor and the operator each own specific rows, and each row should carry written evidence.

What is the next step after sign-off?

Choosing the machine configuration for the footprint and expected demand, then requesting a quote.

Summary

Tell us the site and the expected demand, and we will walk through the readiness rows and a reference configuration.

Browse the machine series on the product page, see OEM/ODM cooperation on the cooperation page, or reach the team via the contact page.